ProductsDiscrete SemiconductorsSB560
PACKAGE REFERENCEDO-201ADConfirm case, pinout and ordering suffix before purchase.
MANUFACTURER PART RECORD

SB560

onsemi

SB560 is an onsemi 5 A Schottky barrier rectifier — VRRM 60 V, forward drop maximum 0.67 V, DO-201AD axial package. The 5 A rating in an axial package is the selection point: through-hole high-current rectification and reverse-polarity protection where SMD is not an option. Selection advice: lifecycle note — onsemi lists the SB560 as Obsolete; for ongoing production specify a current-production SB560 from an active manufacturer or the SMD equivalent. At 5 A the 0.67 V drop dissipates over 3 W — provide adequate copper or heatsinking, and verify the DO-201AD footprint against the DO-41 (smaller) and DO-27 variants, which are not interchangeable. Evidence: distributor data confirms onsemi SB560 Obsolete, 5 A, 60 V, DO-201AD. Match the full SB560 code. State quantity, packing and date-code requirements in your RFQ; we reconfirm the offered lot before quotation and reply within 24 hours.

Discrete SemiconductorsSchottky diodeDO-201AD
MPN
SB560
Manufacturer
onsemi
Family
Schottky diode
Package
DO-201AD
Manufacturer channel coverage
Checked by RFQ
Data last checked
Commercial check required
PROCUREMENT DATA

Identity and sourcing requirements.

Manufacturer part number
SB560
Manufacturer
onsemi
Product family
Schottky diode
Category
Discrete Semiconductors
Package reference
DO-201AD
Manufacturer-channel report
Confirmed on request
Sourceics price status
Quoted for required quantity
Sourceics sourcing status
Supplier and stock verified during RFQ
Required order checks
Suffix, package, date code, lot, source and traceability
SELECTION GUIDANCE

SB560 selection guidance

SB560 is a Schottky diode from onsemi, orderable in the DO-201AD package. The ordering code fixes the exact configuration you receive — package, grade and packing — so procurement starts with matching this code character-for-character against your BOM, not just the base series name.

When you request a quote, include the full ordering code, the target packing format (reel, tube, tray or cut tape), your quantity and any date-code or lot requirements. We reconfirm manufacturer, suffix, package, date code and traceability against the actual offered lot before any commercial quote is issued, and every RFQ gets a reply within 24 hours.

QUOTE WORKFLOW

Four checks before a commercial offer.

01

Identity

Exact MPN, manufacturer and suffix

02

Supply

Supplier type, quantity and freshness

03

Evidence

Lot, labels, photos and documents

04

Terms

Price, lead time, payment and shipping

RELATED REFERENCES

Explore more Discrete Semiconductors records

Browse existing catalog records — same series first, then the same category and manufacturer. These are not confirmed replacements; compatibility requires engineering review.

MARKET INSIGHTS

Procurement coverage for SB560

In-depth buyer guides on the market forces affecting this part category — allocation, mergers and technology shifts.

COMMON QUESTIONS

SB560 FAQ

What do the suffixes in SB560 mean?

Every suffix in a manufacturer ordering code identifies one exact orderable device — package, temperature grade, packing format or a revision. SB560 names the DO-201AD configuration; a code that differs by even one suffix character may be a different device. Always quote the complete code exactly as it appears on your BOM.

What is the difference between package and packing for SB560?

The package (DO-201AD) is the physical form of the device itself. Packing describes how the devices are delivered — reel, tube, tray or cut tape. The same ordering code can ship in different packing formats depending on the lot, so confirm the required packing format when you submit your RFQ.

Can you provide traceability documents for SB560?

Traceability evidence — lot and date-code information, labels and photos — is confirmed per lot at quotation time, because it depends on the actual lot offered. Tell us which documents your receiving inspection requires when you submit the RFQ, and we will confirm what can be provided for the offered lot.

How do I request a quotation for SB560?

Add SB560 to your RFQ with the complete ordering code, the manufacturer (onsemi), your quantity, the target packing format and any date-code requirements. We reply to every RFQ within 24 hours.