Murata
9 component profiles — every part number below links to its full reference record with datasheet, specifications and RFQ.
Murata is the highest-volume MLCC manufacturer in the world, and all nine Murata profiles here are the passives that surround every active device: multilayer ceramic capacitors, power inductors and ferrite beads. These are the lines where package size, capacitance or inductance value and tolerance drive both fit and availability — confirm the full ordering code, because a single suffix changes the reel quantity or the characteristics. For power rails, pair the Murata inductor and capacitor selection with the regulator datasheet recommendations.
Sourcing notes for Murata parts. Always quote the complete manufacturer ordering code — package, temperature grade, speed or accuracy grade, and packing (reel, tube or tray) all change availability and price, and suffixes are where most mismatches happen. Check the lifecycle status on the manufacturer site before committing to a multi-year build; parts flagged not-recommended or obsolete need a last-time-buy plan or a verified alternate lined up early. With every offer, request traceability documents — date code, lot code and original packing — and confirm the inspection steps your supplier applies to high-risk lots.
All Murata parts (9)
| MPN | Function | Package | Record |
|---|---|---|---|
| BLM18EG221SN1D | 220R Ferrite Bead | 0603 | View → |
| BLM18PG121SN1D | 120R Ferrite Bead | 0603 | View → |
| GRM188C80G476ME01D | 47uF 4V MLCC | 0603 | View → |
| GRM188R71H104KA93D | 0.1uF 50V MLCC | 0603 | View → |
| GRM21BR61C106KE15L | 10uF 16V MLCC | 0805 | View → |
| GRM21BR61H106KE43L | 10uF 50V MLCC | 0805 | View → |
| GRM31CR61E476ME44L | 47uF 25V MLCC | 1206 | View → |
| GRM31CR71E106KA12L | 10uF X7R MLCC | 1206 | View → |
| LQH32PN100MNCL | 10uH Power Inductor | 1210 | View → |
Murata by category
Need stock on Murata parts?
Send one RFQ with your part numbers, quantities and target terms. We verify availability before quoting — response within 24 hours.
Start an RFQ →