ProductsDiscrete SemiconductorsMMBT3904
PACKAGE REFERENCESOT-23Confirm case, pinout and ordering suffix before purchase.
MANUFACTURER PART RECORD

MMBT3904

Diotec

Diotec lists MMBT3904 as active — an NPN bipolar junction transistor, VCEO 40 V, IC 200 mA, 0.35 W, SOT-23 package, 150 °C junction temperature. The MMBT3904 is the SMD incarnation of the classic 2N3904: identical die characteristics in a SOT-23 footprint for automated assembly. Selection advice: confirm your circuit was designed for the SMD package — the through-hole 2N3904 and MMBT3904 are electrically equivalent but not footprint-compatible. The complementary PNP is the MMBT3906; for push-pull or complementary stages, source both from the same manufacturer to keep gain grades matched. Parameters verified against the Diotec official product page. State quantity, packing and date-code requirements in your RFQ; we reconfirm the offered lot before quotation and reply within 24 hours.

Discrete SemiconductorsNPN transistorSOT-23
MPN
MMBT3904
Manufacturer
Diotec
Family
NPN transistor
Package
SOT-23
Manufacturer channel coverage
Checked by RFQ
Data last checked
Commercial check required
PROCUREMENT DATA

Identity and sourcing requirements.

Manufacturer part number
MMBT3904
Manufacturer
Diotec
Product family
NPN transistor
Category
Discrete Semiconductors
Package reference
SOT-23
Manufacturer-channel report
Confirmed on request
Sourceics price status
Quoted for required quantity
Sourceics sourcing status
Supplier and stock verified during RFQ
Required order checks
Suffix, package, date code, lot, source and traceability
SELECTION GUIDANCE

MMBT3904 selection guidance

MMBT3904 is a NPN transistor from Diotec, orderable in the SOT-23 package. The ordering code fixes the exact configuration you receive — package, grade and packing — so procurement starts with matching this code character-for-character against your BOM, not just the base series name.

When you request a quote, include the full ordering code, the target packing format (reel, tube, tray or cut tape), your quantity and any date-code or lot requirements. We reconfirm manufacturer, suffix, package, date code and traceability against the actual offered lot before any commercial quote is issued, and every RFQ gets a reply within 24 hours.

QUOTE WORKFLOW

Four checks before a commercial offer.

01

Identity

Exact MPN, manufacturer and suffix

02

Supply

Supplier type, quantity and freshness

03

Evidence

Lot, labels, photos and documents

04

Terms

Price, lead time, payment and shipping

RELATED REFERENCES

Explore more Discrete Semiconductors records

Browse existing catalog records — same series first, then the same category and manufacturer. These are not confirmed replacements; compatibility requires engineering review.

COMMON QUESTIONS

MMBT3904 FAQ

What do the suffixes in MMBT3904 mean?

Every suffix in a manufacturer ordering code identifies one exact orderable device — package, temperature grade, packing format or a revision. MMBT3904 names the SOT-23 configuration; a code that differs by even one suffix character may be a different device. Always quote the complete code exactly as it appears on your BOM.

What is the difference between package and packing for MMBT3904?

The package (SOT-23) is the physical form of the device itself. Packing describes how the devices are delivered — reel, tube, tray or cut tape. The same ordering code can ship in different packing formats depending on the lot, so confirm the required packing format when you submit your RFQ.

Can you provide traceability documents for MMBT3904?

Traceability evidence — lot and date-code information, labels and photos — is confirmed per lot at quotation time, because it depends on the actual lot offered. Tell us which documents your receiving inspection requires when you submit the RFQ, and we will confirm what can be provided for the offered lot.

How do I request a quotation for MMBT3904?

Add MMBT3904 to your RFQ with the complete ordering code, the manufacturer (Diotec), your quantity, the target packing format and any date-code requirements. We reply to every RFQ within 24 hours.